Bathroom renovation
The bathroom was stripped back to the frame and the floor opened up to the subfloor, where the old pipes were exposed. A tile layout was drawn up for each wall before any tile went on.
New wall linings went in with a new skylight, and the floor was set out to a strip drain. It was finished in large-format tile with a green feature wall, a freestanding bath, a frameless shower screen, a wall-hung vanity with a mirror cabinet, and a tiled niche.
What we did
- 01Stripped to the frame and subfloor
- 02New skylight
- 03New wall linings
- 04Floor set out to a strip drain
- 05Large-format tile with a green feature wall
- 06Freestanding bath and frameless shower screen
- 07Wall-hung timber vanity and mirror cabinet
- 08Tiled shower niche