
Plastering and linings · During the build
Insulation and wall linings, Avenel
Rooms insulated and lined, a bath set into a lined window bay, and the plasterboard set ready for paint. Photographed during the build.
- Type
- Plastering and linings
- Suburb
- Avenel
- Service
- Plastering and painting
- 01Insulation in the walls and ceiling
- 02Walls lined, with grooved panelling in the bathroom
- 03Bath hob framed and lined in the window bay
- 04Wet area walls prepared and lined
- 05Plasterboard joints and fixings set
Same View
Hob framed And Bath set in
Hob framed
Bath set inFramed and insulated

01Insulation in 
02Walls insulated 
03Framing around a doorway
Lined

04Bath hob lined 
05Bath set in 
06Grooved panelling 
07Wet area walls 
08Lined walls
Set

09Hallway lined 
10Joints and fixings set 
11Set around the window 
12The window bay
Next project
Under-stair cupboards, Templestowe
The space under a staircase fitted out with full-height cupboards and shelving.
View project
Get Started
Planning A Job Like This?
Answer a few quick questions and we will come back to you.
- Your quote is free and done on site
- You see every trade on your quote
- No obligation, and your details stay with us
Prefer to talk?
Step 01 of 05
What are you planning?
Choose all that apply.






